Solar energy paper index

A Scenario Framework for Investment Appraisal and Shared Risk in Smart Microgrids in Industrial Zones

2026-08-03 · Journal of risk and financial management

One-line summary

A solar energy research paper on A Scenario Framework for Investment Appraisal and Shared Risk in Smart Microgrids in Industrial Zones.

Engineering notes

Engineering notes will be added by the Power for Solar editorial team.

Chinese explanation / 中文解读

中文解读待补充:本站会优先为光伏效率、钙钛矿太阳能电池、储能技术、太阳能热利用、BIPV、并网技术等高价值论文补充中文说明。

Original abstract

This study develops a scenario-based analytical framework for assessing smart microgrids in industrial zones as infrastructure investments and for analyzing multi-actor risk allocation and governance. No empirically validated return is reported for a specific Bulgarian industrial zone. Public institutional, market, financial, technology and environmental sources are instead used to benchmark the scenario assumptions. Three scenarios are evaluated for a reference zone with annual consumption of 12,000 MWh. The model incorporates photovoltaic (PV) degradation, battery round-trip efficiency of 85–90%, annual usable-capacity degradation, one modeled battery replacement within a 12–15-year service interval, component-based capital and operating expenditures, and an author-defined semi-quantitative likelihood–impact risk matrix. Net present value (NPV) is EUR −1,114,726 in the conservative scenario, EUR 697,836 in the baseline scenario and EUR 3,424,835 in the favorable scenario. Discounted payback is not achieved within 20 years in the conservative scenario and is approximately 14.1 and 7.0 years in the baseline and favorable scenarios, respectively. Deterministic one-at-a-time sensitivity analysis identifies electricity price, capital expenditures, and the direct PV self-consumption ratio as the dominant financial drivers.The indicative reduction in location-based emissions associated with grid electricity purchases is 802.9–1385.5 tonnes of carbon dioxide equivalent (tCO2e) per year under the selected grid-average electricity emission factor. The contribution lies in integrating public-data availability assessment, external parameter benchmarking, battery service life, degradation and replacement economics, investment appraisal, threshold analysis, semi-quantitative risk prioritization and contractual risk allocation within one reproducible framework. The outputs remain illustrative and require project-level validation using measured hourly loads, binding prices, financing terms and enforceable contracts.

5.0Engineering value
7.0Research novelty
4.0Business relevance

Links and sources

Need this topic turned into a technical roadmap?

Power for Solar can prepare a custom solar energy literature review, simulation code map, dataset map, and B2B photovoltaic technology assessment.

Request B2B research

Comments

No comments yet. Be the first to share your thoughts on this paper.
Login or register to leave a comment