Solar energy paper index

Interface Engineering:The Critical Pathway to High-Efficiencyand Stable Perovskite Solar Cells

2026-08-04 · Industrial & Engineering Chemistry Research

One-line summary

A solar energy research paper on Interface Engineering:The Critical Pathway to High-Efficiencyand Stable Perovskite Solar Cells.

Engineering notes

Engineering notes will be added by the Power for Solar editorial team.

Chinese explanation / 中文解读

中文解读待补充:本站会优先为光伏效率、钙钛矿太阳能电池、储能技术、太阳能热利用、BIPV、并网技术等高价值论文补充中文说明。

Original abstract

Abstract Against the global demand for renewable and sustainable clean energy, perovskite solar cells (PSCs) have shown great potential as a next-generation photovoltaic technology, owing to their high photoelectric conversion efficiency (PCE) and low-cost potential. Although the highest PCE of PSCs has exceeded 27%, poor stability and severe nonradiative recombination loss still hinder their further development. PSCs contain several critical interfaces, including the electron transport layer (ETL)/perovskite, hole transport layer (HTL)/perovskite, and charge transport layer (CTL)/electrode, which strongly influence carrier dynamics and dominate device efficiency and stability. Interface engineering has attracted extensive attention as an effective modification strategy, yet a systematic review focusing on its working mechanism is insufficient. In this review, we analyze the influence of interfacial defects on carrier dynamic processes and comprehensively summarize the latest progress of interface engineering in PSCs from ETL/perovskite, HTL/perovskite, and CTL/electrode aspects. We highlight the key roles of interface engineering in rationalizing energy-level alignment, passivating defects, optimizing perovskite film quality, and improving device stability. We also provide general guidance for selecting appropriate interfacial strategies according to specific performance bottlenecks. Finally, the challenges and future perspectives of interface engineering toward high-performance PSCs are discussed.

5.0Engineering value
7.0Research novelty
4.0Business relevance

Links and sources

Need this topic turned into a technical roadmap?

Power for Solar can prepare a custom solar energy literature review, simulation code map, dataset map, and B2B photovoltaic technology assessment.

Request B2B research

Comments

No comments yet. Be the first to share your thoughts on this paper.
Login or register to leave a comment